Building a medical clinic in office environment had it’s challenges:
– Strict regulations for the HVAC system: two additional air handling units were installed in the front and in the back of the clinic, to provide enough filtered and sterile air
– Installing a full body X-Ray machine needed additional slab reinforcement and lead insulation in separation walls